CFR / 
Title 48
 / 
Part 546
 / 
546.302-72 Destination inspection.
The contracting officer shall include the clause at 552.246-78, Inspection at Destination (JUL 09)in supply contracts that require inspection at destination.
[74 FR 26108, June 1, 2009]