CFR / 
Title 49
 / Part 196
 / 
Sec. 196.107 What must an excavator do if a pipeline is damaged by
If a pipeline is damaged in any way by excavation activity, the excavator must promptly report such damage to the pipeline operator, whether or not a leak occurs, at the earliest practicable moment following discovery of the damage.