(a) This section outlines the procedure to be followed to close out RUS Contract Form 257 (Contract to Construct Buildings) and construction or rehabilitation performed by the force account method.
(b) RUS Form 257 Contract. (1) Whenever changes were made in the plans and specifications which did not require immediate submission to RUS of an amendment under Sec. 1753.11, a final contract amendment showing the changes shall be prepared.
(1) Whenever changes were made in the plans and specifications which did not require immediate submission to RUS of an amendment under Sec. 1753.11, a final contract amendment showing the changes shall be prepared.
(2) Upon completion of the project, the borrower shall obtain certifications from the architect or engineer that the project and all required documentation are satisfactory and complete. The requirements for this certification are contained in Sec. 1753.18.
(3) The engineer's or architect's contract closeout certification and the final amendment shall be submitted to RUS as a basis for the final advance of funds for the contract.
(4) After all required RUS approvals are obtained, final payment is made in accordance with article III of RUS Form 257 once the borrower has received the architect's or engineer's certifications regarding satisfactory completion of the project.
(c) Upon completion of force account construction, the borrower shall:
(1) Arrange with its architect or engineer and the GFR for final inspection of the project.
(2) Complete, with the assistance of its architect or engineer, the documents listed in the following table that are required for the closeout of force account construction.
Documents Required To Closeout Construction of Buildings----------------------------------------------------------------------------------------------------------------
Use with No. of copies prepared Distribution
------------------- by ---------------------
RUS Form No. Description ------------------------
Contract Force Architect/ Borrower Contractor
account Contractor engineer----------------------------------------------------------------------------------------------------------------238.......................... Construction or X ....... .......... (3) (to RUS) (to RUS)
Equipment
Contract
Amendment (if
not previously
submitted, send
to RUS for
approval).181.......................... Certificate of X ....... .......... 2 1 1
Completion
(contract
construction)
\1\.231.......................... Certificate of X ....... 1 .......... 1 ..........
Contractor.224.......................... Waiver and X ....... 1 .......... 1 ..........
Release of Lien
From Each
Supplier.213.......................... Certificate (buy X ....... 1 .......... 1 ..........
American).None \2\..................... ``As Built'' X X .......... 1 1 ..........
Plans and
Specifications.None......................... Guarantees, X ....... 1 .......... 1 ..........
Warranties,
Bonds,
Operating or
Maintenance
Instructions,
etc.None......................... Architect/ X X .......... 2 1 1
Engineer
seismic safety
certification.----------------------------------------------------------------------------------------------------------------\1\ Cost of materials and services furnished by borrower are not to be included in Total Cost on RUS Form 181.\2\ When only minor changes were made during construction, two copies of a statement to that effect from the
Architect will be accepted instead of the ``as built'' Plans and Specifications.
(3) Make distribution of the completed documents as indicated in the table in this section.
(d) Final payment shall not be made until RUS has approved the closeout documents. [54 FR 39267, Sept. 25, 1989. Redesignated at 55 FR 39396, Sept. 27, 1990, as amended at 59 FR 43717, Aug. 25, 1994; 64 FR 16606, Apr. 6, 1999] Sec. Sec. 1753.31-1753.35 [Reserved]