You must submit the supporting information listed in the following table with the form identified in column 1 and for the approvals required under this subpart identified in columns 2 through 4: ----------------------------------------------------------------------------------------------------------------
Production
WPT BSEE-0126 Gas cap Downhole within 500-ft
(2 copies) production commingling of a unit or
(a) Maps:
(1) Base map with surface, bottomhole, ............... [bcheck] [bcheck] [bcheck]
and completion locations with respect
to the unit or lease line and the
orientation of representative seismic
lines or cross-sections................
(2) Structure maps with penetration [bcheck] [bcheck] [bcheck] [bcheck]
point and subsea depth for each well
penetrating the reservoirs,
highlighting subject wells; reservoir
boundaries; and original and current
fluid levels...........................
(3) Net sand isopach with total net sand ............... [bcheck] [bcheck]
penetrated for each well, identified at
the penetration point..................
(4) Net hydrocarbon isopach with net ............... [bcheck] [bcheck]
feet of pay for each well, identified
at the penetration point...............(b) Seismic data:
(1) Representative seismic lines, ............... [bcheck] [bcheck] [bcheck]
including strike and dip lines that
confirm the structure; indicate
polarity...............................
(2) Amplitude extraction of seismic ............... [bcheck] [bcheck] [bcheck]
horizon, if applicable.................(c) Logs:
(1) Well log sections with tops and [bcheck] [bcheck] [bcheck] [bcheck]
bottoms of the reservoir(s) and
proposed or existing perforations......
(2) Structural cross-sections showing ............... [bcheck] [bcheck] *
the subject well and nearby wells......(d) Engineering data:
(1) Estimated recoverable reserves for ............... [dagger] [dagger] [bcheck]
each well completion in the reservoir;
total recoverable reserves for each
reservoir; method of calculation;
reservoir parameters used in volumetric
and decline curve analysis.............
(2) Well schematics showing current and ............... [bcheck] [bcheck] [bcheck]
proposed conditions....................
(3) The drive mechanism of each ............... [bcheck] [bcheck] [bcheck]
reservoir..............................
(4) Pressure data, by date, and whether ............... [bcheck] [bcheck]
they are estimated or measured.........
(5) Production data and decline curve ............... [bcheck] [bcheck]
analysis indicative of the reservoir
performance............................
(6) Reservoir simulation with the ............... * * *
reservoir parameters used, history
matches, and prediction runs (include
proposed development scenario).........(e) General information:
(1) Detailed economic analysis.......... ............... * *
(2) Reservoir name and whether or not it ............... [bcheck] [bcheck] [bcheck]
is competitive as defined under Sec.
250.105................................
(3) Operator name, lessee name(s), ............... [bcheck] [bcheck] [bcheck]
block, lease number, royalty rate, and
unit number (if applicable) of all
relevant leases........................
(4) Geologic overview of project........ ............... [bcheck] [bcheck] [bcheck]
(5) Explanation of why the proposed ............... [bcheck] [bcheck] [bcheck]
completion scenario will maximize
ultimate recovery......................
(6) List of all wells in subject ............... [bcheck] [bcheck] [bcheck]
reservoirs that have ever produced or
been used for injection................----------------------------------------------------------------------------------------------------------------[bcheck] Required.[dagger] Each Gas Cap Production request and Downhole Commingling request must include the estimated recoverable
reserves for (1) the case where your proposed production scenario is approved, and (2) the case where your
proposed production scenario is denied.* Additional items the Regional Supervisor may request.Note: All maps must be at a standard scale and show lease and unit lines. The Regional Supervisor may waive
submittal of some of the required data on a case-by-case basis.
(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in Sec. 250.125, according to the instructions in Sec. 250.126.