Code of Federal Regulations (alpha)

CFR /  Title 30  /  Part 250  /  Sec. 250.1167 What information must I submit with forms and for approvals?

You must submit the supporting information listed in the following table with the form identified in column 1 and for the approvals required under this subpart identified in columns 2 through 4: ----------------------------------------------------------------------------------------------------------------

Production

WPT BSEE-0126 Gas cap Downhole within 500-ft

(2 copies) production commingling of a unit or

(a) Maps:

(1) Base map with surface, bottomhole, ............... [bcheck] [bcheck] [bcheck]

and completion locations with respect

to the unit or lease line and the

orientation of representative seismic

lines or cross-sections................

(2) Structure maps with penetration [bcheck] [bcheck] [bcheck] [bcheck]

point and subsea depth for each well

penetrating the reservoirs,

highlighting subject wells; reservoir

boundaries; and original and current

fluid levels...........................

(3) Net sand isopach with total net sand ............... [bcheck] [bcheck]

penetrated for each well, identified at

the penetration point..................

(4) Net hydrocarbon isopach with net ............... [bcheck] [bcheck]

feet of pay for each well, identified

at the penetration point...............(b) Seismic data:

(1) Representative seismic lines, ............... [bcheck] [bcheck] [bcheck]

including strike and dip lines that

confirm the structure; indicate

polarity...............................

(2) Amplitude extraction of seismic ............... [bcheck] [bcheck] [bcheck]

horizon, if applicable.................(c) Logs:

(1) Well log sections with tops and [bcheck] [bcheck] [bcheck] [bcheck]

bottoms of the reservoir(s) and

proposed or existing perforations......

(2) Structural cross-sections showing ............... [bcheck] [bcheck] *

the subject well and nearby wells......(d) Engineering data:

(1) Estimated recoverable reserves for ............... [dagger] [dagger] [bcheck]

each well completion in the reservoir;

total recoverable reserves for each

reservoir; method of calculation;

reservoir parameters used in volumetric

and decline curve analysis.............

(2) Well schematics showing current and ............... [bcheck] [bcheck] [bcheck]

proposed conditions....................

(3) The drive mechanism of each ............... [bcheck] [bcheck] [bcheck]

reservoir..............................

(4) Pressure data, by date, and whether ............... [bcheck] [bcheck]

they are estimated or measured.........

(5) Production data and decline curve ............... [bcheck] [bcheck]

analysis indicative of the reservoir

performance............................

(6) Reservoir simulation with the ............... * * *

reservoir parameters used, history

matches, and prediction runs (include

proposed development scenario).........(e) General information:

(1) Detailed economic analysis.......... ............... * *

(2) Reservoir name and whether or not it ............... [bcheck] [bcheck] [bcheck]

is competitive as defined under Sec.

250.105................................

(3) Operator name, lessee name(s), ............... [bcheck] [bcheck] [bcheck]

block, lease number, royalty rate, and

unit number (if applicable) of all

relevant leases........................

(4) Geologic overview of project........ ............... [bcheck] [bcheck] [bcheck]

(5) Explanation of why the proposed ............... [bcheck] [bcheck] [bcheck]

completion scenario will maximize

ultimate recovery......................

(6) List of all wells in subject ............... [bcheck] [bcheck] [bcheck]

reservoirs that have ever produced or

been used for injection................----------------------------------------------------------------------------------------------------------------[bcheck] Required.[dagger] Each Gas Cap Production request and Downhole Commingling request must include the estimated recoverable

reserves for (1) the case where your proposed production scenario is approved, and (2) the case where your

proposed production scenario is denied.* Additional items the Regional Supervisor may request.Note: All maps must be at a standard scale and show lease and unit lines. The Regional Supervisor may waive

submittal of some of the required data on a case-by-case basis.

(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in Sec. 250.125, according to the instructions in Sec. 250.126.