Section 250.101
|
What does this part do? |
Section 250.102
|
Where can I find more information about the requirements in this part? |
Section 250.103
|
How may I appeal a decision made under BSEE regulations? |
Section 250.104
|
Definitions |
Section 250.105
|
What standards will the Director use to regulate lease operations? |
Section 250.106
|
What must I do to protect health, safety, property, and the environment? |
Section 250.107
|
What requirements must I follow for cranes and other material-handling equipment? |
Section 250.108
|
What documents must I prepare and maintain related to welding? |
Section 250.109
|
What must I include in my welding plan? |
Section 250.110
|
Who oversees operations under my welding plan? |
Section 250.111
|
What standards must my welding equipment meet? |
Section 250.112
|
What procedures must I follow when welding? |
Section 250.113
|
How must I install and operate electrical equipment? |
Section 250.114
|
Will BSEE approve gas injection? |
Section 250.118
|
How does injecting, storing, or treating gas affect my royalty payments? |
Section 250.120
|
What happens when the reservoir contains both original gas in place and injected gas? |
Section 250.121
|
What effect does subsurface storage have on the lease term? |
Section 250.122
|
Will BSEE approve gas injection into the cap rock containing a sulphur deposit? |
Section 250.124
|
Service fees |
Section 250.125
|
Electronic payment instructions |
Section 250.126
|
Why does BSEE conduct inspections? |
Section 250.130
|
Will BSEE notify me before conducting an inspection? |
Section 250.131
|
What must I do when BSEE conducts an inspection? |
Section 250.132
|
Will BSEE reimburse me for my expenses related to inspections? |
Section 250.133
|
What will BSEE do if my operating performance is unacceptable? |
Section 250.135
|
How will BSEE determine if my operating performance is unacceptable? |
Section 250.136
|
When will I receive an oral approval? |
Section 250.140
|
May I ever use alternate procedures or equipment? |
Section 250.141
|
How do I receive approval for departures? |
Section 250.142
|
How do I designate an agent or a local agent? |
Section 250.145
|
Who is responsible for fulfilling leasehold obligations? |
Section 250.146
|
How do I name facilities and wells in the Gulf of Mexico Region? |
Section 250.150
|
How do I name facilities in the Pacific Region? |
Section 250.151
|
How do I name facilities in the Alaska Region? |
Section 250.152
|
Do I have to rename an existing facility or well? |
Section 250.153
|
What identification signs must I display? |
Section 250.154
|
May operations or production be suspended? |
Section 250.168
|
What effect does suspension have on my lease? |
Section 250.169
|
How long does a suspension last? |
Section 250.170
|
How do I request a suspension? |
Section 250.171
|
When may the Regional Supervisor grant or direct an SOO or SOP? |
Section 250.172
|
When may the Regional Supervisor direct an SOO or SOP? |
Section 250.173
|
When may the Regional Supervisor grant or direct an SOP? |
Section 250.174
|
When may the Regional Supervisor grant an SOO? |
Section 250.175
|
Does a suspension affect my royalty payment? |
Section 250.176
|
What additional requirements may the Regional Supervisor order for a suspension? |
Section 250.177
|
What am I required to do to keep my lease term in effect? |
Section 250.180
|
What reporting information and report forms must I submit? |
Section 250.186
|
What are BSEE's incident reporting requirements? |
Section 250.187
|
What incidents must I report to BSEE and when must I report them? |
Section 250.188
|
Reporting requirements for incidents requiring immediate notification |
Section 250.189
|
Reporting requirements for incidents requiring written notification |
Section 250.190
|
How does BSEE conduct incident investigations? |
Section 250.191
|
What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence? |
Section 250.192
|
Reports and investigations of possible violations |
Section 250.193
|
How must I protect archaeological resources? |
Section 250.194
|
What notification does BSEE require on the production status of wells? |
Section 250.195
|
Reimbursements for reproduction and processing costs |
Section 250.196
|
Data and information to be made available to the public or for limited inspection |
Section 250.197
|
Documents incorporated by reference |
Section 250.198
|
Paperwork Reduction Act statements--information collection |
Section 250.199
|
Definitions |
Section 250.200
|
What plans and information must I submit before I conduct any activities on my lease or unit? |
Section 250.201
|
How must I protect the rights of the Federal government? |
Section 250.204
|
Are there special requirements if my well affects an adjacent property? |
Section 250.205
|
Do I have to conduct post-approval monitoring? |
Section 250.282
|
What is a DWOP? |
Section 250.286
|
For what development projects must I submit a DWOP? |
Section 250.287
|
When and how must I submit the Conceptual Plan? |
Section 250.288
|
What must the Conceptual Plan contain? |
Section 250.289
|
What operations require approval of the Conceptual Plan? |
Section 250.290
|
When and how must I submit the DWOP? |
Section 250.291
|
What must the DWOP contain? |
Section 250.292
|
What operations require approval of the DWOP? |
Section 250.293
|
May I combine the Conceptual Plan and the DWOP? |
Section 250.294
|
When must I revise my DWOP? |
Section 250.295
|
Pollution prevention |
Section 250.300
|
Inspection of facilities |
Section 250.301
|
Who is subject to the requirements of this subpart? |
Section 250.400
|
What must I do to keep wells under control? |
Section 250.401
|
When and how must I secure a well? |
Section 250.402
|
What drilling unit movements must I report? |
Section 250.403
|
What are the requirements for the crown block? |
Section 250.404
|
What are the safety requirements for diesel engines used on a drilling rig? |
Section 250.405
|
What additional safety measures must I take when I conduct drilling operations on a platform that has producing wells or has other hydrocarbon |
Section 250.406
|
What tests must I conduct to determine reservoir characteristics? |
Section 250.407
|
May I use alternative procedures or equipment during drilling operations? |
Section 250.408
|
May I obtain departures from these drilling requirements? |
Section 250.409
|
How do I obtain approval to drill a well? |
Section 250.410
|
What information must I submit with my application? |
Section 250.411
|
What requirements must the location plat meet? |
Section 250.412
|
What must my description of well drilling design criteria address? |
Section 250.413
|
What must my drilling prognosis include? |
Section 250.414
|
What must my casing and cementing programs include? |
Section 250.415
|
What must I include in the diverter and BOP descriptions? |
Section 250.416
|
What must I provide if I plan to use a mobile offshore drilling unit (MODU)? |
Section 250.417
|
What additional information must I submit with my APD? |
Section 250.418
|
What well casing and cementing requirements must I meet? |
Section 250.420
|
What are the casing and cementing requirements by type of casing string? |
Section 250.421
|
When may I resume drilling after cementing? |
Section 250.422
|
What are the requirements for pressure testing casing? |
Section 250.423
|
What are the requirements for prolonged drilling operations? |
Section 250.424
|
What are the requirements for pressure testing liners? |
Section 250.425
|
What are the recordkeeping requirements for casing and liner pressure tests? |
Section 250.426
|
What are the requirements for pressure integrity tests? |
Section 250.427
|
What must I do in certain cementing and casing situations? |
Section 250.428
|
When must I install a diverter system? |
Section 250.430
|
What are the diverter design and installation requirements? |
Section 250.431
|
How do I obtain a departure to diverter design and installation requirements? |
Section 250.432
|
What are the diverter actuation and testing requirements? |
Section 250.433
|
What are the recordkeeping requirements for diverter actuations and tests? |
Section 250.434
|
What are the general requirements for BOP systems and system components? |
Section 250.440
|
What are the requirements for a surface BOP stack? |
Section 250.441
|
What are the requirements for a subsea BOP system? |
Section 250.442
|
What associated systems and related equipment must all BOP systems include? |
Section 250.443
|
What are the choke manifold requirements? |
Section 250.444
|
What are the requirements for kelly valves, inside BOPs, and drill-string safety valves? |
Section 250.445
|
What are the BOP maintenance and inspection requirements? |
Section 250.446
|
When must I pressure test the BOP system? |
Section 250.447
|
What are the BOP pressure tests requirements? |
Section 250.448
|
What additional BOP testing requirements must I meet? |
Section 250.449
|
What are the recordkeeping requirements for BOP tests? |
Section 250.450
|
What must I do in certain situations involving BOP equipment or systems? |
Section 250.451
|
What are the general requirements for a drilling fluid program? |
Section 250.455
|
What safe practices must the drilling fluid program follow? |
Section 250.456
|
What equipment is required to monitor drilling fluids? |
Section 250.457
|
What quantities of drilling fluids are required? |
Section 250.458
|
What are the safety requirements for drilling fluid-handling areas? |
Section 250.459
|
What are the requirements for conducting a well test? |
Section 250.460
|
What are the requirements for directional and inclination surveys? |
Section 250.461
|
What are the requirements for well-control drills? |
Section 250.462
|
Who establishes field drilling rules? |
Section 250.463
|
When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE? |
Section 250.465
|
What records must I keep? |
Section 250.466
|
How long must I keep records? |
Section 250.467
|
What well records am I required to submit? |
Section 250.468
|
What other well records could I be required to submit? |
Section 250.469
|
Hydrogen sulfide |
Section 250.490
|
General requirements |
Section 250.500
|
Definition |
Section 250.501
|
Equipment movement |
Section 250.502
|
Emergency shutdown system |
Section 250.503
|
Hydrogen sulfide |
Section 250.504
|
Subsea completions |
Section 250.505
|
Crew instructions |
Section 250.506
|
Well-completion structures on fixed platforms |
Section 250.509
|
Diesel engine air intakes |
Section 250.510
|
Traveling-block safety device |
Section 250.511
|
Field well-completion rules |
Section 250.512
|
Approval and reporting of well-completion operations |
Section 250.513
|
Well-control fluids, equipment, and operations |
Section 250.514
|
What BOP information must I submit? |
Section 250.515
|
Blowout prevention equipment |
Section 250.516
|
Blowout preventer system tests, inspections, and maintenance |
Section 250.517
|
Tubing and wellhead equipment |
Section 250.518
|
What are the requirements for casing pressure management? |
Section 250.519
|
How often do I have to monitor for casing pressure? |
Section 250.520
|
When do I have to perform a casing diagnostic test? |
Section 250.521
|
How do I manage the thermal effects caused by initial production on a newly completed or recompleted well? |
Section 250.522
|
When do I have to repeat casing diagnostic testing? |
Section 250.523
|
How long do I keep records of casing pressure and diagnostic tests? |
Section 250.524
|
When am I required to take action from my casing diagnostic test? |
Section 250.525
|
What do I submit if my casing diagnostic test requires action? |
Section 250.526
|
What must I include in my notification of corrective action? |
Section 250.527
|
What must I include in my casing pressure request? |
Section 250.528
|
What are the terms of my casing pressure request? |
Section 250.529
|
What if my casing pressure request is denied? |
Section 250.530
|
When does my casing pressure request approval become invalid? |
Section 250.531
|
General requirements |
Section 250.600
|
Definitions |
Section 250.601
|
Equipment movement |
Section 250.602
|
Emergency shutdown system |
Section 250.603
|
Hydrogen sulfide |
Section 250.604
|
Subsea workovers |
Section 250.605
|
Crew instructions |
Section 250.606
|
Well-workover structures on fixed platforms |
Section 250.609
|
Diesel engine air intakes |
Section 250.610
|
Traveling-block safety device |
Section 250.611
|
Field well-workover rules |
Section 250.612
|
Approval and reporting for well-workover operations |
Section 250.613
|
Well-control fluids, equipment, and operations |
Section 250.614
|
What BOP information must I submit? |
Section 250.615
|
Blowout prevention equipment |
Section 250.616
|
Blowout preventer system testing, records, and drills |
Section 250.617
|
What are my BOP inspection and maintenance requirements? |
Section 250.618
|
Tubing and wellhead equipment |
Section 250.619
|
Wireline operations |
Section 250.620
|
General requirements |
Section 250.800
|
Subsurface safety devices |
Section 250.801
|
Design, installation, and operation of surface production-safety systems |
Section 250.802
|
Additional production system requirements |
Section 250.803
|
Production safety-system testing and records |
Section 250.804
|
Safety device training |
Section 250.805
|
Safety and pollution prevention equipment quality assurance requirements |
Section 250.806
|
Additional requirements for subsurface safety valves and related equipment installed in high pressure high temperature (HPHT) environments |
Section 250.807
|
Hydrogen sulfide |
Section 250.808
|
What general requirements apply to all platforms? |
Section 250.900
|
What industry standards must your platform meet? |
Section 250.901
|
What are the requirements for platform removal and location clearance? |
Section 250.902
|
What records must I keep? |
Section 250.903
|
What is the Platform Approval Program? |
Section 250.904
|
How do I get approval for the installation, modification, or repair of my platform? |
Section 250.905
|
Where must I locate foundation boreholes? |
Section 250.907
|
What are the minimum structural fatigue design requirements? |
Section 250.908
|
What is the Platform Verification Program? |
Section 250.909
|
Which of my facilities are subject to the Platform Verification Program? |
Section 250.910
|
If my platform is subject to the Platform Verification Program, what must I do? |
Section 250.911
|
What plans must I submit under the Platform Verification Program? |
Section 250.912
|
When must I resubmit Platform Verification Program plans? |
Section 250.913
|
How do I nominate a CVA? |
Section 250.914
|
What are the CVA's primary responsibilities? |
Section 250.915
|
What are the CVA's primary duties during the design phase? |
Section 250.916
|
What are the CVA's primary duties during the fabrication phase? |
Section 250.917
|
What are the CVA's primary duties during the installation phase? |
Section 250.918
|
What in-service inspection requirements must I meet? |
Section 250.919
|
What are the BSEE requirements for assessment of fixed platforms? |
Section 250.920
|
How do I analyze my platform for cumulative fatigue? |
Section 250.921
|
General requirements |
Section 250.1000
|
Definitions |
Section 250.1001
|
Design requirements for DOI pipelines |
Section 250.1002
|
Installation, testing, and repair requirements for DOI pipelines |
Section 250.1003
|
Safety equipment requirements for DOI pipelines |
Section 250.1004
|
Inspection requirements for DOI pipelines |
Section 250.1005
|
How must I decommission and take out of service a DOI pipeline? |
Section 250.1006
|
What to include in applications |
Section 250.1007
|
Reports |
Section 250.1008
|
Requirements to obtain pipeline right-of-way grants |
Section 250.1009
|
General requirements for pipeline right-of-way holders |
Section 250.1010
|
Required payments for pipeline right-of-way holders |
Section 250.1012
|
Grounds for forfeiture of pipeline right-of-way grants |
Section 250.1013
|
When pipeline right-of-way grants expire |
Section 250.1014
|
Applications for pipeline right-of-way grants |
Section 250.1015
|
Granting pipeline rights-of-way |
Section 250.1016
|
Requirements for construction under pipeline right-of-way grants |
Section 250.1017
|
Assignment of pipeline right-of-way grants |
Section 250.1018
|
Relinquishment of pipeline right-of-way grants |
Section 250.1019
|
What are the general reservoir production requirements? |
Section 250.1150
|
How often must I conduct well production tests? |
Section 250.1151
|
How do I conduct well tests? |
Section 250.1152
|
What steps must I take to receive approval to produce within 500 feet of a unit or lease line? |
Section 250.1156
|
How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap? |
Section 250.1157
|
How do I receive approval to downhole commingle hydrocarbons? |
Section 250.1158
|
May the Regional Supervisor limit my well or reservoir production rates? |
Section 250.1159
|
When may I flare or vent gas? |
Section 250.1160
|
When may I flare or vent gas for extended periods of time? |
Section 250.1161
|
When may I burn produced liquid hydrocarbons? |
Section 250.1162
|
How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain? |
Section 250.1163
|
What are the requirements for flaring or venting gas containing H [bdi2]S? |
Section 250.1164
|
What must I do for enhanced recovery operations? |
Section 250.1165
|
What additional reporting is required for developments in the Alaska OCS Region? |
Section 250.1166
|
What information must I submit with forms and for approvals? |
Section 250.1167
|
Question index table |
Section 250.1200
|
Definitions |
Section 250.1201
|
Liquid hydrocarbon measurement |
Section 250.1202
|
Gas measurement |
Section 250.1203
|
Surface commingling |
Section 250.1204
|
Site security |
Section 250.1205
|
What is the purpose of this subpart? |
Section 250.1300
|
What are the requirements for unitization? |
Section 250.1301
|
What if I have a competitive reservoir on a lease? |
Section 250.1302
|
How do I apply for voluntary unitization? |
Section 250.1303
|
How will BSEE require unitization? |
Section 250.1304
|
How does BSEE begin the civil penalty process? |
Section 250.1400
|
Index table |
Section 250.1401
|
Definitions |
Section 250.1402
|
What is the maximum civil penalty? |
Section 250.1403
|
Which violations will BSEE review for potential civil penalties? |
Section 250.1404
|
When is a case file developed? |
Section 250.1405
|
When will BSEE notify me and provide penalty information? |
Section 250.1406
|
How do I respond to the letter of notification? |
Section 250.1407
|
When will I be notified of the Reviewing Officer's decision? |
Section 250.1408
|
What are my appeal rights? |
Section 250.1409
|
What definitions apply to this subpart? |
Section 250.1450
|
What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease? |
Section 250.1451
|
What if I correct the violation? |
Section 250.1452
|
What if I do not correct the violation? |
Section 250.1453
|
How may I request a hearing on the record on a Notice of Noncompliance? |
Section 250.1454
|
Does my request for a hearing on the record affect the penalties? |
Section 250.1455
|
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance? |
Section 250.1456
|
May I be subject to penalties without prior notice and an opportunity to correct? |
Section 250.1460
|
How will BSEE inform me of violations without a period to correct? |
Section 250.1461
|
How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct? |
Section 250.1462
|
Does my request for a hearing on the record affect the penalties? |
Section 250.1463
|
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance? |
Section 250.1464
|
How does BSEE decide what the amount of the penalty should be? |
Section 250.1470
|
Does the penalty affect whether I owe interest? |
Section 250.1471
|
How will the Office of Hearings and Appeals conduct the hearing on the record? |
Section 250.1472
|
How may I appeal the Administrative Law Judge's decision? |
Section 250.1473
|
May I seek judicial review of the decision of the Interior Board of Land Appeals? |
Section 250.1474
|
When must I pay the penalty? |
Section 250.1475
|
Can BSEE reduce my penalty once it is assessed? |
Section 250.1476
|
How may BSEE collect the penalty? |
Section 250.1477
|
May the United States criminally prosecute me for violations under Federal oil and gas leases? |
Section 250.1480
|
What standards must my BOEM-specified surety instrument meet? |
Section 250.1490
|
How will BOEM determine the amount of my bond or other surety instrument? |
Section 250.1491
|
How do I demonstrate financial solvency? |
Section 250.1495
|
How will BOEM determine if I am financially solvent? |
Section 250.1496
|
When will BOEM monitor my financial solvency? |
Section 250.1497
|
Definitions |
Section 250.1500
|
What is the goal of my training program? |
Section 250.1501
|
What are my general responsibilities for training? |
Section 250.1503
|
May I use alternative training methods? |
Section 250.1504
|
Where may I get training for my employees? |
Section 250.1505
|
How often must I train my employees? |
Section 250.1506
|
How will BSEE measure training results? |
Section 250.1507
|
What must I do when BSEE administers written or oral tests? |
Section 250.1508
|
What must I do when BSEE administers or requires hands-on, simulator, or other types of testing? |
Section 250.1509
|
What will BSEE do if my training program does not comply with this subpart? |
Section 250.1510
|
Performance standard |
Section 250.1600
|
Definitions |
Section 250.1601
|
Applicability |
Section 250.1602
|
Determination of sulphur deposit |
Section 250.1603
|
General requirements |
Section 250.1604
|
Drilling requirements |
Section 250.1605
|
Control of wells |
Section 250.1606
|
Field rules |
Section 250.1607
|
Well casing and cementing |
Section 250.1608
|
Pressure testing of casing |
Section 250.1609
|
Blowout preventer systems and system components |
Section 250.1610
|
Blowout preventer systems tests, actuations, inspections, and maintenance |
Section 250.1611
|
Well-control drills |
Section 250.1612
|
Diverter systems |
Section 250.1613
|
Mud program |
Section 250.1614
|
Securing of wells |
Section 250.1615
|
Supervision, surveillance, and training |
Section 250.1616
|
Application for permit to drill |
Section 250.1617
|
Application for permit to modify |
Section 250.1618
|
Well records |
Section 250.1619
|
Well-completion and well-workover requirements |
Section 250.1620
|
Crew instructions |
Section 250.1621
|
Approvals and reporting of well-completion and well-workover operations |
Section 250.1622
|
Well-control fluids, equipment, and operations |
Section 250.1623
|
Blowout prevention equipment |
Section 250.1624
|
Blowout preventer system testing, records, and drills |
Section 250.1625
|
Tubing and wellhead equipment |
Section 250.1626
|
Production requirements |
Section 250.1627
|
Design, installation, and operation of production systems |
Section 250.1628
|
Additional production and fuel gas system requirements |
Section 250.1629
|
Safety-system testing and records |
Section 250.1630
|
Safety device training |
Section 250.1631
|
Production rates |
Section 250.1632
|
Production measurement |
Section 250.1633
|
Site security |
Section 250.1634
|
What do the terms ``decommissioning'', ``obstructions'', and ``facility'' mean? |
Section 250.1700
|
Who must meet the decommissioning obligations in this subpart? |
Section 250.1701
|
When do I accrue decommissioning obligations? |
Section 250.1702
|
What are the general requirements for decommissioning? |
Section 250.1703
|
When must I submit decommissioning applications and reports? |
Section 250.1704
|
What BOP information must I submit? |
Section 250.1705
|
What are the requirements for blowout prevention equipment? |
Section 250.1706
|
What are the requirements for blowout preventer system testing, records, and drills? |
Section 250.1707
|
What are my BOP inspection and maintenance requirements? |
Section 250.1708
|
What are my well-control fluid requirements? |
Section 250.1709
|
When must I permanently plug all wells on a lease? |
Section 250.1710
|
When will BSEE order me to permanently plug a well? |
Section 250.1711
|
What information must I submit before I permanently plug a well or zone? |
Section 250.1712
|
Must I notify BSEE before I begin well plugging operations? |
Section 250.1713
|
What must I accomplish with well plugs? |
Section 250.1714
|
How must I permanently plug a well? |
Section 250.1715
|
To what depth must I remove wellheads and casings? |
Section 250.1716
|
After I permanently plug a well, what information must I submit? |
Section 250.1717
|
If I temporarily abandon a well that I plan to re-enter, what must I do? |
Section 250.1721
|
If I install a subsea protective device, what requirements must I meet? |
Section 250.1722
|
What must I do when it is no longer necessary to maintain a well in temporary abandoned status? |
Section 250.1723
|
When do I have to remove platforms and other facilities? |
Section 250.1725
|
When must I submit an initial platform removal application and what must it include? |
Section 250.1726
|
What information must I include in my final application to remove a platform or other facility? |
Section 250.1727
|
To what depth must I remove a platform or other facility? |
Section 250.1728
|
After I remove a platform or other facility, what information must I submit? |
Section 250.1729
|
When might BSEE approve partial structure removal or toppling in place? |
Section 250.1730
|
Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE? |
Section 250.1731
|
How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions? |
Section 250.1740
|
If I drag a trawl across a site, what requirements must I meet? |
Section 250.1741
|
What other methods can I use to verify that a site is clear? |
Section 250.1742
|
How do I certify that a site is clear of obstructions? |
Section 250.1743
|
When may I decommission a pipeline in place? |
Section 250.1750
|
How do I decommission a pipeline in place? |
Section 250.1751
|
How do I remove a pipeline? |
Section 250.1752
|
After I decommission a pipeline, what information must I submit? |
Section 250.1753
|
When must I remove a pipeline decommissioned in place? |
Section 250.1754
|
Must I have a SEMS program? |
Section 250.1900
|
What is the goal of my SEMS program? |
Section 250.1901
|
What must I include in my SEMS program? |
Section 250.1902
|
Acronyms and definitions |
Section 250.1903
|
Special instructions |
Section 250.1904
|
What are management's general responsibilities for the SEMS program? |
Section 250.1909
|
What safety and environmental information is required? |
Section 250.1910
|
What hazards analysis criteria must my SEMS program meet? |
Section 250.1911
|
What criteria for management of change must my SEMS program meet? |
Section 250.1912
|
What criteria for operating procedures must my SEMS program meet? |
Section 250.1913
|
What criteria must be documented in my SEMS program for safe work practices and contractor selection? |
Section 250.1914
|
What training criteria must be in my SEMS program? |
Section 250.1915
|
What criteria for mechanical integrity must my SEMS program meet? |
Section 250.1916
|
What criteria for pre-startup review must be in my SEMS program? |
Section 250.1917
|
What criteria for emergency response and control must be in my SEMS program? |
Section 250.1918
|
What criteria for investigation of incidents must be in my SEMS program? |
Section 250.1919
|
What are the auditing requirements for my SEMS program? |
Section 250.1920
|
What qualifications must the ASP meet? |
Section 250.1921
|
What qualifications must an AB meet? |
Section 250.1922
|
How will BSEE determine if my SEMS program is effective? |
Section 250.1924
|
May BSEE direct me to conduct additional audits? |
Section 250.1925
|
What happens if BSEE finds shortcomings in my SEMS program? |
Section 250.1927
|
What are my recordkeeping and documentation requirements? |
Section 250.1928
|
What are my responsibilities for submitting OCS performance measure data? |
Section 250.1929
|
What must be included in my SEMS program for SWA? |
Section 250.1930
|
What must be included in my SEMS program for UWA? |
Section 250.1931
|
What are my EPP requirements? |
Section 250.1932
|
What procedures must be included for reporting unsafe working conditions? |
Section 250.1933
|
Definitions |